Summer Sewage Repair Work to Begin Soon in Penn Hills
An area just outside of Pittsburgh is getting a sewer system upgrade and at the cost of roughly $900,000. Penn Hills is embarking on a
An area just outside of Pittsburgh is getting a sewer system upgrade and at the cost of roughly $900,000. Penn Hills is embarking on a
The city of Pittsburgh has engineered a highly effective sewer system which is designed to induce an overflow, if necessary. This may seem counterintuitive but
Pittsburgh has recently launched a new program for residents that includes lead testing. If you’re a customer of the Pittsburgh Water and Sewer Authority, you
The Pittsburgh sewer project is finally underway that is part of a $5.3 million initiative to rebuild Forbes between Smithfield and Wood Street, which has
Many of us are experiencing a rainy season now that summer is in full swing. Along with the sunny delights and fanfare this time of
Our Waterline Renewal Technologies product lines are completely designed, manufactured, built and supported in the United States of America! The quality is best in class and you can trust Waterline Renewal Technologies to be here for you if and when you need support on this system.
Made in the U.S.A. means a lot. We take great pride in manufacturing this ultraviolet lining system here in the United States. Our pride shows in the component quality & longevity of our trenchless pipe lining equipment and systems.
It means something to us!
Address:
25 NW Point Blvd., Suite 560
Elk Grove Village, IL 60007
Phone: 847-457-1810
Emergency: 888-915-2477
(technical support)
Email: info@waterlinerenewal.com
Monday – Friday: 8:00am – 5:00pm CST